SLX-Initial Powerup

06 Jun 2025

Synopsis:

Users may encounter situations where their switch does not appear to start up successfully or not power up at all. Troubleshooting this process has several phases:

  1. Physical connections check
  2. Power type check
  3. LED indicator check
  4. Additional troubleshooting
  5. RMA criteria

Phase 1: Physical connections check

Confirm DC power is connected to P1 and/or P2 terminals (positive lead) as well as the “-” terminal (negative/return). Ensure the power block is firmly seated into the socket.

Phase1 2.jpg

SLX series switch power terminal block

Phase 2: Power type check

Confirm DC power in the range of 10 to 30 Volts is supplied. The recommended Voltage is 24VDC.

Phase 3: LED indicator check

When power is applied, the P1 and/or P2 LEDs should be illuminated, depending upon which terminals are being supplied with power. On managed switches (part numbers SL(X)-xMS or xMG), the status LED should also flash for several seconds and then illuminate steadily. This indicates that the switch has begun the startup process. Unmanaged switches (SL(X)-xES) do not have a status LED. Switch startup times are as follows:

  • SL(X)-xMS or -xMG – roughly 45 seconds
  • SL(X)-xRS – Roughly 10 seconds
  • SL(X)-xES – roughly 5 seconds

After these times, the port LEDs should accurately indicate Link and Traffic status. The OK LED is a configurable alarm. Depending upon your configuration, this LED may be on or off.

Phase3 2.gif

SLX-5ES, SLX-9ES switches: Power LEDs and SLX-5MS-MDM switch: Status, P1, P2 LEDs

Phase 4: Additional troubleshooting

Size of power supply

It is important to ensure that the power supply used to power your Sixnet switch is large enough. Particularly with switches that have many fiber ports, we recommend using one power supply per switch unless your power supply is very high capacity. Sixnet recommends reviewing the power input ratings on the label of your unit and allocating 2-3 times this capacity for the initial startup current.

If you are having problems with switches not always powering up or repeatedly rebooting, try removing all equipment but your Sixnet switch from the supply.

 

Phase 5: RMA criteria

After progressing though phases 1-4, if the switch still does not power up correctly, there may be a hardware failure with your switch. Please gather the following information and an RMA request will be generated:

  • Full model number
  • Serial number and/or Date code (older units may only have a date code)
  • Any information related to the failure, such as potential cause if known

Phase5 1.jpg

Switch side label

Disclaimer

It is the customer's responsibility to review the advice provided herein and its applicability to the system. HMS makes no representation about specific knowledge of the customer's system or the specific performance of the system. HMS is not responsible for any damage to equipment or connected systems. The use of this document is at your own risk. HMS standard product warranty applies.

HMS Technical Support

If you have any questions or trouble, contact HMS Technical Support by clicking here.

For more information: Product warranty and return policy | HMS Networks